API St 7CW pdf download

API St 7CW pdf download

API St 7CW pdf download Casing Wear Tests 4.4.3 Substantive changes to the material chemistry or application process shall require requalification of thematerial. 4.4.4The test specimen length and diameter dimensions shall be defined by this standard.4.5Test Agency Requirements 4.5.1 The test agency shall conduct tests in accordance with this standard. 4.5.2The test agency shall be responsible for assuring itself, the...

API St 20H pdf download

API St 20H pdf download

API St 20H pdf download Heat Treatment Services—Batch Type for Equipment Used in the Petroleum and Natural Gas Industry 4.3Heat Treatment Specification Levels 4.3.1 Heat Treatment Specification Level 1 (HSL-1) 4.3.1.1 The pyrometric requirements for heat treatment equipment in conformance with HSL-1 shall be inaccordance with 8.2. 4.3.1.2A temperature uniformity survey (TUS) shall be performed every 12 months minimum for...

API St 603 pdf download

API St 603 pdf download

API St 603 pdf download Corrosion-resistant, Bolted Bonnet Gate Valves—Flanged and Butt-welding Ends 5.3Body Dimensions5.3.1 Flanged Ends 5.3.1.1 Body end flanges shall comply with the dimensional requirements of ASME B16.5.Unless otherwisespecified, raised face end flanges shall be provided. The Purchaser may specify a flange facing finish other than thatspecified in ASME B16.5. 5.3.1.2Face-to-face dimensions shall be in accordance with ASME...

API St 608 pdf download

API St 608 pdf download

API St 608 pdf download Metal Ball Valves—Flanged, Threaded, and Welding Ends 5.3.9 Upstream sealing, trunnion-mounted ball valves shall have a test port into the body cavity between seats toallow seat testing as specified in APl 598. This test port shall have taper pipe threads in accordance withASME B.1.20.1 and shall be fited with a solid test plug conforming to...

API St 622 pdf download

API St 622 pdf download

API St 622 pdf download Type Testing of Process Valve Packing for Fugitive Emissions 6 Packing Materials Test The packing materials test considers weight loss, density, lubricant content, and leachables as per the proceduresoutlined below.For new configurations, test packing shall be selected at random from a minimum production lot assupplied by the manufacturer. For existing configurations, test packing shall be...

API St 624 pdf download

API St 624 pdf download

API St 624 pdf download Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions 4Valve Selection and Test Preparation 4.1The APl 622 certficate or test report for the packing in the test valve shall be provided and attached to the API624 fugitive emissions test report. 4.2The test valve shall be completely assembled and ready for testing....

API St 2220 pdf download

API St 2220 pdf download

API St 2220 pdf download Contractor Safety Performance Process 4.2 Owner Commitment To Improved Contractor Safety Performance Common to all successful contractor safety programs are the owners’ commitment to, and continued support of, the programs. The owners’ commitment and support are essential in minimizing incidents and preventing injuries and illnesses. Effective contractor safety programs require the owners to focus resources...

API STD 603 pdf download

API STD 603 pdf download

API STD 603 pdf download Corrosion-resistant, Bolted Bonnet Gate Valves—Flanged and Butt-welding Ends 5.3Body Dimensions5.3.1 Flanged Ends 5.3.1.1Body end flanges shall comply with the dimensional requirements of ASME B16.5.Unless otherwisespecified, raised face end flanges shall be provided. The Purchaser may specify a flange facing finish other than thatspecified in ASME B16.5. 5.3.1.2 Face-to-face dimensions shall be in accordance with ASMEB16.10.Body...

API STD 622 pdf download

API STD 622 pdf download

API STD 622 pdf download Type Testing of Process Valve Packing for Fugitive Emissions 4.1.8 The fixture shall be heated using an external heat source, blanket, heating coils or other suitable equipment.NOTE Refer to ASME Section vll Division 2, Section 5.5, for information on fatigue analysis methodology. 4.2Leak Test Equipment Selection and Calibration 4.2.1 Monitoring equipment shall be a flame...

API TR 5TP pdf download

API TR 5TP pdf download

API TR 5TP pdf download Torque-Position Assembly Guidelines for API Casing and Tubing Connections This document provides alternative connection assembly procedures to those found in APl 5B(power turns)and those found in APIl 5C1(optimum torque). The procedures set forth are referred to as “torque-position”because the make-up torque and final position are used as acceptance criteria for the assembly operation.The connections are...