API RP 6DR pdf download

API RP 6DR pdf download Recommended Practice for the Repair and Remanufacture of Pipeline Valves 4Preparation for Shipment to the Reconditioner The owner shall complete the following activities before sending the equipment to the reconditioner: a) All pressure shall be removed from valve cavities and accompanying actuators, tanks, etc. b) Hazardous materials shall be removed and cleaned from the valve...